Program Phases

  • : Function ereg() is deprecated in /home/smartcam/edrive/includes/file.inc on line 895.
  • : Function ereg() is deprecated in /home/smartcam/edrive/includes/file.inc on line 895.
  • : Function ereg() is deprecated in /home/smartcam/edrive/includes/file.inc on line 895.
  • : Function ereg() is deprecated in /home/smartcam/edrive/includes/file.inc on line 895.
  • : Function ereg() is deprecated in /home/smartcam/edrive/includes/file.inc on line 895.
  • : Function ereg() is deprecated in /home/smartcam/edrive/includes/file.inc on line 895.
  • : Function ereg() is deprecated in /home/smartcam/edrive/includes/file.inc on line 895.
  • : Function ereg() is deprecated in /home/smartcam/edrive/includes/file.inc on line 895.

There are two Phases of the e-Drive program. Phase I lasts 3.5 years and is highly competitive for electric vehicles (EVs), Plug-in Hybrid Electric Vehicles (PHEVs), and electric and PHEV powertrains for conversions. The best performing solution(s) are rewarded with a large Phase II contract. Each phase procures approximately 10,000 electric drive vehicles (or powertrains that are used in conversions of existing LLVs) and 12,000 charging stations. An overview of the highly competitive Phase I is below: